Gantt Chart Maker

This tool draws a Gantt chart from a list of tasks with a start date and a length. It shows progress and a line for a date you pick, plus a table of dates, as SVG or PNG.

How to use Gantt Chart Maker online

  1. Write the tasks. Name, start, length.
  2. Add progress if you like. A number from 0 to 100.
  3. Mark a date. To see where you are.
  4. Download. SVG or PNG.

Why use this free Gantt Chart Maker

  • Dates, lengths and after-task starts
  • Progress bars
  • Date marker
  • Days, weeks or months axis
  • Table of dates
  • SVG and PNG download

A plan on a timeline

A Gantt chart lays tasks as bars on a calendar so that you see what overlaps, what follows what, and how long the whole plan runs. Write one task on each line as Task | start | length, with an optional progress figure. The chart and a table of start and end dates appear as you type.

Starts and lengths

A start is a date written year-month-day, such as 2026-03-02, or the words after and another task name, which starts the day after that task ends. A length is a number of days or weeks, written 5d or 2w, or an end date. The tool checks every line and names the one with a bad date, an end before the start or a task it cannot find.

Progress and today

Add a progress figure from 0 to 100 as a fourth part, and the bar is filled to that share. Switch on the date marker and type a date to draw a dashed line across the chart, which shows what should be done by then. The time axis can be days, weeks or months, or chosen for you by the length of the plan.

How days are counted

Days are calendar days, weekends included, and a task that lasts one day starts and ends on the same date. A task after another starts on the next day. The tool does not know holidays or working days, so for a plan in working days, convert the length yourself. Up to 80 tasks can be drawn.

Using the chart

Download an SVG for a report or a PNG for a slide, or copy the table into a spreadsheet. The plan is worked out in your browser and is not sent anywhere. A Gantt chart is a picture of a plan and not a project manager: it does not move other tasks when one slips, so update the list as things change.

Using the tool

Change the text or any option of the Gantt Chart Maker and the answer moves straight away. Open a text file into the box, or drop one on it.

Gantt Chart Maker: frequently asked questions

How do I start a task after another?
Write after and the name of the task as the start.
How do I write a length?
As days or weeks, such as 5d or 2w, or an end date.
Are weekends counted?
Yes. Days are calendar days.
Can I show progress?
Yes, add a number from 0 to 100 as a fourth part.
How many tasks can I draw?
Up to 80.
Can anyone see the text I put into the Gantt Chart Maker?
It stays in your browser tab; the Gantt Chart Maker sends nothing anywhere.
Can I save what the Gantt Chart Maker gives me?
Press Use result as input and the Gantt Chart Maker answer becomes the new input.

Related searches for Gantt Chart Maker

  • Gantt Chart Maker online
  • free Gantt Chart Maker
  • Gantt Chart Maker online free
  • Gantt Chart Maker for mobile
  • Gantt Chart Maker without sign up
  • Gantt Chart Maker – Design & Planning

Gantt Chart Maker is a free online tool on MAITBOX, in the Design & Planning group. It runs in your browser, so what you type is not sent to a server. It works on Android and iPhone, and on Windows, Mac and Linux, with no download and no account.